
Tanguro - trip from 27.6.-1.7.2022
Licor reinstallation after repair
Tarek went in July to the Tanguro field site in Brazil and reinstalled together with colleagues from IPAM two of the three eddy covariance systems. Additionally, they did some maintenance and small repairs of the measurement towers. Even though the rental car nearly lost a front weel on the way to site, it all worked out as planned.
Pictures:

Leo is working on the agricultural tower. Corn is already dry and waiting to be harvested.
T.S. El-Madany/BGC

The burned site tower after installing the gas analyzer of the eddy covariance systems.
T.S. El-Madany/BGC